How is the next internal inspection date set for a tank bottom?
After the first internal inspection, the next one is set by the bottom. API 653 clause 4.4.5.1 says the bottom’s least remaining thickness, minus the product-side and soil-side corrosion over the interval, must still meet the minimum remaining thickness (MRT) at the end of it. Solve that for the interval and cap it at twenty years, or thirty with a release prevention barrier (clause 6.4.2.2.1).
The MRT equation
MRT = (minimum of RTbc or RTip) − Or × (StPr + UPr). RTbc and RTip are the least remaining thickness from soil-side and product-side corrosion after repairs; StPr is the largest unrepaired product-side rate; UPr is the soil-side rate; Or is the years to the next internal inspection. Rearranged: Or = (least remaining thickness − required MRT) ÷ (StPr + UPr).
- UPr is a straight-line rate over the age of the tank, worked from the minimum remaining thickness after repairs. It is zero for areas under effective cathodic protection.
- StPr is zero for coated areas, but only if the coating is expected to last the whole interval.
- Where the bottom was scanned by MFL and has no effective cathodic protection, the thickness used for UPr is the lesser of the MFL threshold and the thinnest unrepaired corrosion (NOTE 1). The owner sets the MFL threshold to suit the interval wanted.
What MRT has to be
Table 4.4 sets the minimum bottom plate thickness at the next inspection by foundation design: a tenth of an inch for a bottom with no means to detect and contain a leak, and half that, a twentieth of an inch, for a bottom with leak detection and containment or with a reinforced lining to API 652. The critical zone next to the shell has its own, separate minimum (clause 4.4.5.4), and so does an annular ring (clause 4.4.6).
When the interval comes out too short
Clause 4.4.5.3: if the bottom would fall below the Table 4.4 minimum before the interval you want, the bottom is lined, repaired or replaced, or the interval is shortened. Only welded repairs count toward the remaining thickness: pit welding, overlay welding or welded-on lap patches under clause 4.4.5.5. Coatings, caulking, epoxies and bolting do not raise RTip or RTbc (clause 4.4.5.6).
Not the first internal inspection
A new tank, or a tank with a new bottom, gets its first internal date from clause 6.4.2.1 and Table 6.1 instead, unless the conditions there for carrying over the old bottom’s rates are met. An owner/operator may also set the subsequent interval by RBI (risk-based inspection) under clause 6.4.2.2.2.
Working it out
The free bottom interval calculator takes the governing minimum, the nominal thickness, the bottom age and the safeguard, and shows the rate, the remaining life and the capped interval. In TankForge the same calculation runs from the floor readings and prints in the draft report with its clause.
Also asked as
How is the API 653 internal inspection interval calculated?
With the minimum remaining thickness equation of clause 4.4.5.1, solved for the years to the next inspection, then capped at twenty years, or thirty with a release prevention barrier.
What is the minimum remaining bottom thickness?
Table 4.4 sets it at the next inspection by foundation design: a tenth of an inch with no means to detect and contain a leak, a twentieth of an inch with leak detection and containment or a reinforced lining. The critical zone and any annular ring have separate minimums.
How long until the next out-of-service inspection?
The years until the bottom’s least remaining thickness, losing metal at the measured product-side and soil-side rates, reaches the required minimum, but never more than twenty years, or thirty with a release prevention barrier.
TankForge is API 653 inspection software built by a working API 653 inspector. Draft report. Your certified inspector reviews and signs.