What counts as a major repair or major alteration under API 653?
API 653 clause 3.25 defines a major repair or major alteration as work that includes any one of nine items. The definition matters because clause 12.3.1 requires a full hydrostatic test after a major repair or alteration unless one of the exemptions in 12.3.3 is taken.
The nine items
- A shell penetration larger than twelve-inch nominal pipe size installed below the design liquid level.
- A bottom penetration installed within twelve inches (three hundred millimetres) of the shell.
- Removing and replacing, or adding, a shell plate below the design liquid level when the longest dimension of the new plate is over twelve inches.
- Removing or replacing annular plate ring material when the longest dimension of the new plate is over twelve inches.
- Removing and replacing more than twelve inches of vertical shell weld or radial annular-ring weld, whether the whole weld or more than half its thickness.
- A nonmetallic repair that carries more than half the strength of the shell over an area more than twelve inches high.
- Installing a new bottom. Replacing portions of the bottom as described in clause 12.3.4.3 does not count.
- Removing and replacing part of the shell-to-bottom weld (or shell-to-annular-ring weld) beyond the amounts in clause 12.3.3.5.1 a).
- Jacking the shell.
Where inspectors get caught
Most of the items depend on where the work sits. A shell plate or penetration counts only below the design liquid level, so the level has to be known before the call is made. A bottom penetration counts by its distance from the shell. The twelve-inch measures are the longest dimension of the new plate, or the length of weld removed, not its area.
Some items need an engineer. Whether a nonmetallic or composite repair carries more than half the shell strength depends on how it was designed: Annex J says a composite repair designed on the laminate alone is major. Jacking is always major, and taking a hydrotest exemption for it is the engineer’s decision under clause 12.3.3.6.
What is not major
Clause 12.3.4 names two kinds of work that are not major: any repair or alteration to a floating roof, and replacing portions of the bottom outside the critical zone when the subgrade is acceptable and the annular ring, or the shell and bottom support in the critical zone, stays intact. Repairs that fall outside the nine items, such as most corrosion weld build-up and small patches above the liquid level, are not major either, though they still follow the repair and examination rules of Sections 9 and 12.
Repairs in TankForge